Seven Shores Amenity Building Metal Roof Installation – Naples
Completed new construction project. Seven Shores Amenity Buildings – Naples, FL. Installed standing seam metal roof at a social building and fitness building.
Completed new construction project. Seven Shores Amenity Buildings – Naples, FL. Installed standing seam metal roof at a social building and fitness building.
Addressed ongoing leaks and an old roof coating over plywood decking. Installed DensDek coverboard and adhered 60-mil TPO membrane. Also added walkway pads around roof hatch and A/C units. Before: After:
Photos of a repair in Naples. The client asked us to install two new solar powered Attic fans into their flat roof. Our crew cut the opening, built the curb, and installed the fan. Before: After:
Complete roof replacement in Sarasota. Client had some damage from Hurricane Milton that they were able to fix. Before: After:
Back patio replacement in Naples. Back patio had some rotten plywood that needed to be fixed but now the patio has a 20-year roof on it and is not a worry for the homeowner. Before: After:
Repair where they removed the tile and stucco around a cupola in Naples and had the stucco replaced and repainted. Then they reinstalled the tile, reusing the existing tile to avoid additional cost and ensure the repair was not noticeable. Before: After:
Repair / coating project at a front entrance awning in Naples. The awning was installed poorly and water was leaking through the metal panels. They had to prime the metal, provide additional flashing materials at the seams and fasteners, as well as covering the whole awning with liquid coating. They
Emergency repair done to a roof in Cape Coral. A tree fell on the building leaving a large hole, They removed the shingles, installed new plywood decking and then replaced the shingles. Before: After:
Repair of TPO roof for a property manager. TPO wasn't properly flashed at the stucco wall. They applied liquid flashing, embedded fabric into the liquid flashing, then applied more liquid flashing. They then installed a surface mount counter flashing to finish the repair.